Perhitungan Overall Equipment Effectiveness (Oee) Pada Line 5/4l45w PT. Otscon Safety Indonesia

  • Agung Sobirin Universitas Singaperbangsa Karawang
  • Kusnadi Kusnadi Universitas Singaperbangsa Karawang
  • Dene Herwanto Universitas Singaperbangsa Karawang
Keywords: Overall Equipment Effectiveness , total preventive maintenance, and production process.

Abstract

The development of the manufacturing industry gives rise to global competition. The characteristics of the competition force the company to achieve world class performance through continuous improvement. The application of continuous improvement resulted in several methods, such as total preventive maintenance, total quality maintenance and just in time. One of the most frequently used method developments is total preventive maintenance (TPM). According to Mobley (2016) defines TPM as a comprehensive maintenance strategy based on a tool life cycle approach that can minimize equipment damage, production defects and work accidents. TPM involves everyone in the organization, from top level management to technicians. PT. Otscon Safety Indonesia is an auto parts supplier company. Currently PT Otscon Safety Indonesia produces automotive components for almost all leading automotive manufacturers such as Mitsubishi, Honda, Nissan, Suzuki and Astra Daihatsu Motor. To produce products that have good quality, PT Otscon Safety Indonesia always pays attention to the room, tools, materials and operators in it. The tools used by PT Otscon Safety Indonesia to produce their products use high-tech tools. To operate it requires an operator who must understand every step in the production process.

References

Hansen, R. C. Overall Equifment Effectiveness : A Powerful Production / Maintenance Tool for In Creased Profit, Industrial Press Inc, New York.

Habib, S, A., dan Supriyanto, H. Pengukuran Nilai Overall Equipment Effectifeness (OEE) Sebagai Pedoman Perbaikan Efektivitas Mesin CNC Cutting. Jurnal Teknik Pomits. 2014

Corder, Antony. (1996) Teknik Management Pemeliharaan, Erlangga.

Hedge, H. G., Mahesh, N. S., & Doss, K. (2015). Overall Equipment Effectiveness Improvement by TPM and 5S Techniques in a CNC Machine Shop. SasTech, Vol 8 No 2 Hal 25-32.

Triwardani, D. H., Rahman, A., & Tantrika, C. F. (2017). Analisis Overall Equipment Effectiveness (Oee) Dalam Meminimalisi Six Big Losses Pada Mesin Produksi Dual Filters Dd07 (Studi kasus : PT. Filtrona Indonesia, Surabaya, Jawa Timur). Hal 379-391.

Ahuja, I.P.S and Khamba, J.S. Total Productive Maintenance, literature review and direction. International Journal of Quality and Reability Management. 2014; 25 (7): 709-756.

Habib, S, A., dan Supriyanto, H. Pengukuran Nilai Overall Equipment Effectifeness (OEE) Sebagai Pedoman Perbaikan Efektivitas Mesin CNC Cutting. Jurnal Teknik Pomits. 2017; 1 (1): 1-6.

Hansen, R.,C. (2015). Overall Equipment Effectiveness: Powerfull Production/Maintenance Tool for Increase Profits, Industrial Press, New York

Lindley R. Higgis & R. Keith Mobley. (2016). Maintenance Engineering Handbook, Seventh Edition, McGraw-Hill.

Rahmad, dkk. (2016). Penerapan Overall Equipment Effectiveness Dalam Implementasi Total Productive Maintenance Studi Kasus di Pabrik Gula PT Y. Jurnal Rekayasa Teknik Mesin Vol 3, No. 3 Tahun 2014. ISSN 0216-468X.Perbaikan, dan Operasi. Jakarta: PT Gramedia Widiasarana Indonesia.

Nugraha, P. M. (2008). Analisis Pengendalian Persediaan Bahan Baku dalam Perencanaan Produksi. Skripsi. Tidak dipublikasikan. Yogyakarta: Universitas Sanata Dharma.

Ristono, Agus. (2009). Manajemen Persediaan. Yogyakarta: Graha Ilmu.

Published
2021-12-11
How to Cite
Sobirin, A., Kusnadi, K., & Herwanto, D. (2021). Perhitungan Overall Equipment Effectiveness (Oee) Pada Line 5/4l45w PT. Otscon Safety Indonesia. Jurnal Ilmiah Wahana Pendidikan, 7(8), 420-426. https://doi.org/10.5281/zenodo.5773961

Most read articles by the same author(s)

1 2 3 > >>