Penerapan Total Productive Maintenance (TPM) Pada Perawatan Mesin Cutter di PT. XYZ

  • Ganep Muhaemin Universitas Singaperbangsa Karawang
  • Asep Erik Nugraha Universitas Singaperbangsa Karawang

Abstract

The development of the global industry in using technology is forcing increasingly fierce competition. This is supported by technological developments with reliable and quality machines. The result is an impact on the ability to create products of sufficient quality and quantity. To compete with other companies, the machine's willingness to carry out production plays an important role. The decline in the function of the machine results in reduced production yields and also the quality of production. Machine maintenance is one way that is intended to maintain the stability of production in a company. The term maintenance is widely known, but has grown to be known as Total Productive Maintenance (TPM). PT. XYZ produces printing and non-printing paper bags. In the NCR department, the cutter machine area is still experiencing 25% more machine problems than other areas so that further analysis is needed from the TPM index assessment through the OEE score. Therefore, the purpose of this study is to determine the value of OEE as an analysis of the six big losses and recommendations for improvement. The research methodology is direct observation and interviews with stakeholders related to the cutter machine area. The result is that the OEE values ​​in October, November, and December are less than the JPIM standard. In this regard, the company can conduct training for production operators on machine maintenance procedures. Meanwhile, the maintenance department is responsible for the maintenance of the machine

References

Agus Suwarno. (2018). Analisa Implementasi Total Productive Maintenance (TPM) (Studi Kasus : Proses Produksi Valve Kendaraan Bermotor). Seminar Nasional Inovasi Dan Aplikasi Teknologi Di Industri 2018, 108–113.

Alvira, D., Helianty, Y., & Prassetiyo, H. (2015). Usulan Peningkatan Overall Equipment Effectiveness ( Oee ) Pada Mesin Tapping Manual Dengan Meminimumkan Six Big Losses. Jurnal Itenas Bandung, 03(03), 240–251.

Dewi, N. C., & Rinawati, D. I. (2016). ANALISIS PENERAPAN TOTAL PRODUCTIVE MAINTENANCE ( TPM ) DENGAN PERHITUNGAN OVERALL EQUIPMENT EFECTIVENESS ( OEE ) DAN SIX BIG LOSSES MESIN CAVITEC PT . ESSENTRA SURABAYA. Industrial Engineering Online Journal, 4. https://ejournal3.undip.ac.id/index.php/ieoj/article/view/9868

Harahap, U. N., & Nasution, C. (2021). ANALISIS PENINGKATAN PRODUKTIVITAS KERJA MESIN DENGAN MENGGUNAKAN METODE TOTAL PRODUCTIVE MAINTENANCE (TPM) DI PT. CASA WOODWORKING INDUSTRY. JURNAL ILMIAH TEKNIK MESIN, INDUSTRI, ELEKTRO DAN SIPIL, 02(02), 110–114.

Jannah, R. M., Supriyadi, S., & Nalhadi, A. (2017). Analisis Efektivitas pada Mesin Centrifugal dengan Menggunakan Metode Overall Equipment Effectiveness (OEE). Prosiding Seminar Nasional Riset Terapan| SENASSET, 2013, 170–175. https://e-jurnal.lppmunsera.org/index.php/senasset/article/view/444

Nursanti, I., & Susanto, Y. (2014). Analisis Perhitungan Overall Equipment Effectiveness (OEE) pada Mesin Packing untuk Meningkatkan Nilai Availability Mesin. Jurnal Ilmiah Teknik Industri, 13(1), 96–102.

Pratama, M. A., Kurniawan, F. A., Irwan, A., Studi, P., Mesin, T., & Medan, U. H. (2020). ANALISIS PENERAPAN TOTAL PRODUCTIVE MAINTENANCE ( TPM ) MELALUI METODE OVERALL EQUIPMENT EFFECTIVENESS. JITEKH, 8(1), 11–21.

Purba, T., & Marikena, N. (2021). ANALISA PRODUKTIVITAS PERAWATAN FORKLIFT MENUGGUNAKAN METODE PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) DI PT. XYZ. IESM Journal, 2(1), 74–86.

Qilla Aulia Suri, A. M. G. (2019). Fakultas Teknik – Universitas Muria Kudus. Prosiding SNATIF Ke-6 Tahun 2019, 2007, 96–101.

Sariyusda, S., Fakhriza, F., & Putra, J. (2016). Analisa efektivitas prokdusi pada unit urea i dengan menggunakan metode total productive maintenance (TPM) di PT. Pupuk Iskandar Muda. Jurnal POLIMESIN, 14(1), 37. https://doi.org/10.30811/jpl.v14i1.300

Sebastian, H., & Purwaningsih, R. (2021). ANALISIS NILAI PRODUKTIVITAS MESIN LAPPING DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS PADA PT . FLUID SCIENCE. Seminar Dan Konferensi Nasional IDEC, 1–7.

Sembiring, N., Elvira, G. A., Murnawan, H., Mustofa, Kusnadi, B. E., Ienaco, S. N., Pascasarjana, P., Its, K., Laboratorium, S., Teknik, J., Perkapalan, S., Pola, A., Sistem, M. D., Setyadi, I., Djamal, N., Azizi, R., Rinawati, D. I., & Dewi, N. C. (2014). Analisis Penerapan Total Productive Maintenance (TPM) Menggunakan Overall Equipment Effectiveness (OEE) dan Six Big Losses pada Mesin Cavitec di PT. Essentra Surabaya. Prosiding Seminar Nasional Teknologi Dan Informatika, Volume 11(1), 21–26.

Septiani, D. T., Nursanti, E., & Galuh, H. (2020). ANALISA PENINGKATAN PRODUKTIFITAS DENGAN MENGGUNAKAN METODE TPM BERDASARKAN NILAI OEE DAN LOSSES MESIN DI ADVERTISING OZY BISA. 3(2), 41–45.

Septiawan, F. (2020). the Effectiveness of the Use of Google Form in Linear Learning in Motorcycle Maintenance Lessons in Smkn 1 Koba. Jurnal Pendidikan Teknik Mesin, 7(2), 129–135.

Susetyo, A. E. (2017). Analisis Overall Equipment Effectivenes ( OEE ) untuk Menentukan Efektivitas Mesin Sonna Web. Jurnal Science Tech, 3 (2)(2), 93–96.

Tama, V. A., & Ayik Pusaka Ningwati. (2017). ANALISA TERJADINYA SIX BIG LOSSES PADA MESIN EVAPORATOR DENGAN METODE TPM DI SEKSI REFINERY MSG PT. XXX. Journal Knowledge Industrial Engineering, 5, 3–8.

Wahid, A. (2020). Penerapan Total Productive Maintenance (TPM) Produksi Dengan Metode Overall Equipment Effectiveness (OEE) Pada Proses Produksi Botol (PT. XY Pandaan – Pasuruan). Jurnal Teknologi Dan Manajemen Industri, 6(1), 12–16.

Widyadana, I. G. A. (2015). Pengukuran Overall Equipment Effectiveness ( OEE ) di PT Astra Otoparts Tbk . Divisi Adiwira Plastik. Jurnal Titra, 3(1), 41–48. http://studentjournal.petra.ac.id/index.php/teknik-industri/article/download/2981/2686

Yohanes, A., & Ekoanindiyo, F. A. (2021). IMPLEMENTASI TOTAL PRODUCTIVE MAINTENANCE SEBAGAI PENUNJANG PRODUKTIVITAS DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS. Jurnal Manajemen Dan Ternik Industri - Produski, XXI(2), 185–194. https://doi.org/10.350587/Matrik

Zein, I., Mulyati, D., & Saputra, I. (2019). Perencanaan Perawatan Mesin Kompresor Pada PT. Es Muda Perkasa Dengan Metode Reliability Centered Maintenance (RCM). Jurnal Serambi Engineering, 4(1), 383. https://doi.org/10.32672/jse.v4i1.848

Published
2022-06-15
How to Cite
Muhaemin, G., & Nugraha, A. (2022). Penerapan Total Productive Maintenance (TPM) Pada Perawatan Mesin Cutter di PT. XYZ. Jurnal Ilmiah Wahana Pendidikan, 8(9), 205-219. https://doi.org/10.5281/zenodo.6645451

Most read articles by the same author(s)

1 2 > >>