Analisis Perhitungan Rencana Anggaran Biaya (Rab) Pada Jalan Tani Kelurahan Gurabati

  • Siti Rahmawati Yusuf Universitas Nuku
  • Amiruddin Hi. Muhammad Universitas Nuku
  • Indra Altarans
Keywords: RAB, flexible pavement, rigid pavement, farm road

Abstract

This study analyzes the Budget Plan (RAB) calculations for farm road construction in Gurabati Village by comparing flexible pavement and rigid pavement. The methods used include work volume calculations and unit price analysis (AHSP) using Microsoft Excel. The results indicate that the construction cost of flexible pavement is Rp 1,340,350,000, while that of rigid pavement is Rp 1,891,450,000. Based on the analysis of construction costs and long-term maintenance, flexible pavement is more economical to implement. This research can serve as a reference for efficient and tailored farm road construction planning.

Published
2025-12-08
How to Cite
Yusuf, S., Muhammad, A., & Altarans, I. (2025). Analisis Perhitungan Rencana Anggaran Biaya (Rab) Pada Jalan Tani Kelurahan Gurabati. Jurnal Ilmiah Wahana Pendidikan, 11(12.A), 397-405. Retrieved from https://jurnal.peneliti.net/index.php/JIWP/article/view/13344

Most read articles by the same author(s)